|
The manufacturing and fabrication of wind turbines and solar panels here in the Mat-Su Borough is essential to the success of any renewable energy project in Alaska. The central location, wind production, road accessibility, rail belt accessibility, job growth potential and many industrial properties to choose from along the Parks Highway are some of the reasons that we have chosen the Valley.
Through a local vocational development training program local manpower could develop in as little as six months. This green collar worker program has been used throughout the states and all over the world. We have a community that has maintained a unique pioneering spirit.
Skilled welders, electricians, engineers, project management, and accounting, are just some of the positions we hope to fill if this project takes flight.
Here's what's possible in The Mat-Su Valley
- 80,000 square foot manufacturing facility
- Solar panel module assembly, create custom sizes
- Manufacture and fabricate wind towers that could reach 200 feet
- Craft Turbine blades that start at 50 feet each
- Motor housings
- Turbine transmissions
- Electronic controls
- Concrete footing mounts
- Blade molds to be distributed around the state
Below is a thin film solar applicant which would be an important part of the manufacturing of solar panels.
 
 |
|
|